Construction Tower Crane
- Max Load: 4t/6t/8t
- Jib Lenghth: 50-60m
- Rated Lifting Moment: 500KN.m—1250KN.m
- Max Lifting Height: 120m/140m/220m
- Max Load at Jib End: 1t/1.1t/1.3t/1.6t
- Standard: GB/T 5031--2008
Pre:Back To List
- Concrete Batching Plant
- Commercial Concrete Batching Plant
- Ready Mix Concrete Plant
- Project Concrete Batching Plant
- Belt Conveyor Concrete Batching Plant
- Concrete Mixer Plant
- Precast Concrete Plant
- Mini Concrete Batching Plant
- Concrete Mixing Plant
- HZS180 Concrete Mixing Plant
- HZS120 Concrete Mixing Plant
- HZS90 Concrete Mixing Plant
- HZS60 Concrete Mixing Plant
- HZS50 Concrete Mixing Plant
- HZS35 Concrete Mixing Plant
- HZS25 Concrete Mixing Plant
- HZS75 Concrete Mixing Plant
- JS Concrete Mixer
- JS1000 Concrete Mixer
- JS750 Concrete Mixer
- JS500 Concrete Mixer
- JS1500 Concrete Mixer
- JS2000 Concrete Mixer
- JS3000 Concrete Mixer
- SICOMA Concrete Machinery
- SICOMA Concrete Mixer MAO Standard Series
- SICOMA Concrete Mixer MEO Economical Series
- SICOMA Concrete Mixer MSO Mini Series
- SICOMA Planetary Concrete Mixer
- SICOMA Cement Screw Conveyor
- SICOMA Butterfly Valve
- SICOMA Dust Collector
Introduction:
We, Zhengzhou Great Wall Machinery Manufacture Co., Ltd, our tower crane is researched and designed with absorbing the global advanced technology with high performance. We have several technical innovation and break through and have got 7 technical patents. Our tower crane is with following features:
Part of Configurations Features:
1) Steel Structure
Steel is the essential safety guarantee for tower crane. The steel we use for our tower crane is tower crane usage special square steel from Wuhan Iron and Steel Group. Steel material for those essential parts like lifting jib, tower top, frame etc is 16 Manganese Steel. Thus to assure safety, advance and high performance of the crane.
2) Hoisting Mechanism
We apply following technology of mature three velocity-variation pole motor, big center distance speed reducer, big diameter drum to effectively enhance the life span of crane. And the equipped rope mechanism solves the rope disorder issue effectively. The crane is specially equipped with hydraulic push brake to assure stable and reliable braking and easy maintenance.
3) Swing Mechanism
The speed change system is by rheostat variation of wound rotor motor or by frequency change system. The swing of tower crane is flexible, stable, exact positioning, highly reduced swing impact force and with high safety performance.
4) Luffer
It applies double-speed or three-speed motors for speed change control according to the jib length, easy running control, low impact force, high operation stability and high efficiency.
5) Control System
The Electric elements are from Schneider Company to assure high system reliability. The control cables uses air plug for easy and fast assembling and maintenance.
6) Operating System
Newly spacecraft type cabinet room with air conditioning system, wide eye view, high consideration of operator comfortableness and maximally to low down operation fault rate.
7) Security Guards
Except for using the common security devices, we uniquely equips high definition operation tracking monitor system which can thoroughly supervise the lifting hook, ground and construction building and can assure safety operation when with sight blockage.
Refer to P13 of our tower crane catalog:
Performance |
QTZ63 |
QTZ63 |
QTZ63 |
QTZ63 |
QTZ80 |
QTZ80 |
QTZ100 |
QTZ125 |
|
TC5010J-4 |
TC5011-4 |
TC5013-6 |
TC5611-6 |
TC5613-6 |
TC6010-6 |
TC6013-8 |
TC6016-8 |
||
Rated Hoisting Moment |
630 |
560 |
630 |
630 |
800 |
800 |
1000 |
1250 |
|
Maximum Loading |
4 |
4 |
6 |
6 |
6 |
6 |
8 |
8 |
|
Working Range(m) |
3-50 |
2.5-50 |
2.5-50 |
2.5-56 |
2.5-56 |
2.5-60 |
2.5-60 |
2.5-60 |
|
Lifting height |
40/120 |
30/140 |
40.5/220 |
40.5/220 |
40.5/220 |
46/220 |
46/220 |
46/220 |
|
Rated Lifting Capacity |
1 |
1 |
1.3 |
1.1 |
1.3 |
1 |
1.3 |
1.6 |
|
Lifting Speed |
2 Magnification |
65.6/32.8/9.2 |
80/40/8.5 |
80/40/8.88 |
80/40/8.88 |
80/40/8.88 |
80/40 |
80/40 |
100/50 |
4 Magnification |
32.8/16.4/4.6 |
40/20/4.2 |
40/20/4.44 |
40/20/4.44 |
40/20/4.44 |
40/20 |
40/20 |
50/25 |
|
Slewing Speed(turn/minute) |
0-0.62 |
0-0.60 |
0-0.60 |
0-0.65 |
0-0.65 |
0-0.65 |
0-0.8 |
0-0.8 |
|
Luffing Speed(meter/minute) |
40/20 |
40/20 |
40/20 |
40/20 |
40/20 |
53/27/12 |
0-55 |
0-55 |
|
Entire Total Power(kilowait) |
30.4 |
26.1 |
31 |
32.8 |
34.7 |
34.7 |
45 |
52 |
|
MOQ |
1 set |
||||||||
Delivery Time (days) |
12 |
12 |
12 |
12 |
15 |
15 |
20 |
20 |
|
Delivery Port |
Qingdao or Tianjin |
Introduction:
We, Zhengzhou Great Wall Machinery Manufacture Co., Ltd, our tower crane is researched and designed with absorbing the global advanced technology with high performance. We have several technical innovation and break through and have got 7 technical patents. Our tower crane is with following features:
Part of Configurations Features:
1) Steel Structure
Steel is the essential safety guarantee for tower crane. The steel we use for our tower crane is tower crane usage special square steel from Wuhan Iron and Steel Group. Steel material for those essential parts like lifting jib, tower top, frame etc is 16 Manganese Steel. Thus to assure safety, advance and high performance of the crane.
2) Hoisting Mechanism
We apply following technology of mature three velocity-variation pole motor, big center distance speed reducer, big diameter drum to effectively enhance the life span of crane. And the equipped rope mechanism solves the rope disorder issue effectively. The crane is specially equipped with hydraulic push brake to assure stable and reliable braking and easy maintenance.
3) Swing Mechanism
The speed change system is by rheostat variation of wound rotor motor or by frequency change system. The swing of tower crane is flexible, stable, exact positioning, highly reduced swing impact force and with high safety performance.
4) Luffer
It applies double-speed or three-speed motors for speed change control according to the jib length, easy running control, low impact force, high operation stability and high efficiency.
5) Control System
The Electric elements are from Schneider Company to assure high system reliability. The control cables uses air plug for easy and fast assembling and maintenance.
6) Operating System
Newly spacecraft type cabinet room with air conditioning system, wide eye view, high consideration of operator comfortableness and maximally to low down operation fault rate.
7) Security Guards
Except for using the common security devices, we uniquely equips high definition operation tracking monitor system which can thoroughly supervise the lifting hook, ground and construction building and can assure safety operation when with sight blockage.
Refer to P13 of our tower crane catalog:
Performance |
QTZ63 |
QTZ63 |
QTZ63 |
QTZ63 |
QTZ80 |
QTZ80 |
QTZ100 |
QTZ125 |
|
TC5010J-4 |
TC5011-4 |
TC5013-6 |
TC5611-6 |
TC5613-6 |
TC6010-6 |
TC6013-8 |
TC6016-8 |
||
Rated Hoisting Moment |
630 |
560 |
630 |
630 |
800 |
800 |
1000 |
1250 |
|
Maximum Loading |
4 |
4 |
6 |
6 |
6 |
6 |
8 |
8 |
|
Working Range(m) |
3-50 |
2.5-50 |
2.5-50 |
2.5-56 |
2.5-56 |
2.5-60 |
2.5-60 |
2.5-60 |
|
Lifting height |
40/120 |
30/140 |
40.5/220 |
40.5/220 |
40.5/220 |
46/220 |
46/220 |
46/220 |
|
Rated Lifting Capacity |
1 |
1 |
1.3 |
1.1 |
1.3 |
1 |
1.3 |
1.6 |
|
Lifting Speed |
2 Magnification |
65.6/32.8/9.2 |
80/40/8.5 |
80/40/8.88 |
80/40/8.88 |
80/40/8.88 |
80/40 |
80/40 |
100/50 |
4 Magnification |
32.8/16.4/4.6 |
40/20/4.2 |
40/20/4.44 |
40/20/4.44 |
40/20/4.44 |
40/20 |
40/20 |
50/25 |
|
Slewing Speed(turn/minute) |
0-0.62 |
0-0.60 |
0-0.60 |
0-0.65 |
0-0.65 |
0-0.65 |
0-0.8 |
0-0.8 |
|
Luffing Speed(meter/minute) |
40/20 |
40/20 |
40/20 |
40/20 |
40/20 |
53/27/12 |
0-55 |
0-55 |
|
Entire Total Power(kilowait) |
30.4 |
26.1 |
31 |
32.8 |
34.7 |
34.7 |
45 |
52 |
|
MOQ |
1 set |
||||||||
Delivery Time (days) |
12 |
12 |
12 |
12 |
15 |
15 |
20 |
20 |
|
Delivery Port |
Qingdao or Tianjin |